Before you commence any form of Needling you should be a competent builder and have good knowledge in this field

If you have any doubts whatsoever about unusual loads and or the condition of the masonry or timber you should seek professional advice from a structural engineer.

As with any needling job you must determine which way the ceiling joists run. If they run perpendicular to the position of the new opening planks and Acrows will be needed to support the floor above.

Firstly, ascertain the overall height of the steel RSJ to be put in to the opening as this is crucial to the height of your top holes to be drilled for the Sneedle Props. The top of the top holes should be at least 180mm clear of the top of the new steel beams location to allow plenty of room to lay a course of bricks and to dry-pack later on.

When you know your exact location of where the steel should go, mark out on the wall where this is going to be with chalk. Then above this mark out your top holes, measure the length of the new steel and divide this figure by 800mm, for example 3200mm long steel divided by 800mm = 4 so at 800mm centres this will give you four Sneedle Props  at 800mm centres and a starting point of 400mm either end, the 400mm at each end is important as there will be a bit of knocking around in these areas when making room for the new steel and also you don’t want to have the one of the lower members of a Sneedle prop knocked through where the wall is staying!

Now that you have marked your top holes these can be drilled, so using a pilot drill i.e. 10mm masonry bit drill through the outer skin brick or block work then change to a 125mm core drill and drill all the way through this outer skin, remove any debris

Now that you have access you can measure the cavity thickness; this should be done on each hole as they may vary slightly.

For the internal skin this could be brickwork or blockwork and of varying thickness generally 100mm/4 inches but don’t assume, some blockwork can be 3inch 5inch or even 6inches thick. This can be determined by measuring a wall where a window or door is located by measuring the overall and subtracting the outer skin, cavity and wall covering.

Once you have confirmed the thickness of the internal brick or blockwork now measure the depth of the external brickwork + the cavity then add the measurement for two thirds of the thickness of the internal block work, remembering to have allowed for the internal plaster finishing and transfer this total measurement on to your core drill with insulating tape

Now you start to core drill the internal blockwork from outside as soon as the core drill has created the 125mm circle about 15mm deep, remove the center guide bit as you don’t want this to go in to the rooms upstairs!! Then continue until you reach your taped mark against the outer face of the brick work. We suggest that you do this for all the top holes before changing the core bit to a 50mm core drill (just to save you time) Once all the holes have been core drilled to the predetermined depth, set up the 50mm core drill to the same depth and precisely core three overlapping holes within the 125mm hole remembering to remove the core drill center guide drill bit again, as not to drill all the way through in to the upstairs!!

The segments will now break out easily using a long chisel and hammer leaving a clean socket

The next stage is to mark vertically down the wall the center for the lower members of the Sneedle Props and break through the wall at these points ensuring there is enough room for the lower member of the Sneedles to fit through easily. If there are doors or windows in the way these must be removed first!

Ensure that you have a level solid base for all of the size 0 props to sit and sole plates for inside and outside ideally a plank so all the internal size 0’s sit on one plank and all the external size 0’s on another.

NB, we suggest now that band stands are put in place to hold your new steel up and out of the way. Carefully put your steel up on your band stands a notch or two above the lower member holes as you may not have room to manoeuvre the steel in to place once all of the props are in place!

Do see our slide show on the home page of this web site that shows the whole process albeit quite quickly but there is a pause and rewind facility on the slide show.

Measure the depth of the socket in the top hole to the outer side of the outer skin (Y) now offer up a size 0 prop from the sole plate to the lower hole and roughly set the height to that hole to make it easier later on, Using 4 of the nuts and bolts supplied with 4 washers fix the first size 0 prop to the Sneedle Prop creating a “F shape” now 2 person lift the Sneedle Prop in to the top socket ensuring your measurement (Y) is met

Now level the Sneedle prop both ways and tighten the first zero prop. Bolt the second zero prop to the Sneedle prop inside of the building ensuring both props are sat nicely on their retrospective sole plates.

Repeat this process for all of the Sneedles then screw the zero props base plates to the timber sole plates (Laterally restraining them) Now inspect the top holes and make sure the outer brick work is supported as with any form of needling slate packing will be required in places to ensure all is supported.

It is now safe to remove the outer skin brick/block work for the steel

Once this is done a close inspection can be made to ensure the internal blockwork is supported and slate where required. Now the internal block work can be safely removed.

Fit new steel in place on whatever pad stones requested brick up and dry pack as you would a conventional needling job. Leave for 48 hours then the Sneedle Props can be safely removed and all brickwork can be made good

Thank you for Hiring Sneedle Props

 

Health and Safety

Prior to using any Sneedle Props you should identify that this is a suitable method to carry out the planned work if unsure consult a structural engineer. You must identify all loading's that the Sneedle props will have to support including loads from a floor above, a roof, tiles, water tank in loft, full bath, people walking around above etc as you would with any form of needling.

We recommend that only one opening to be created at a time within one length of wall. It should be checked that the masonry and any timbers are in good condition prior to any knock through as remedial work may be needed first.

You should obtain competent structural engineers’ advice if there is any doubt about the condition of the structure or the nature of the loading or if any unusual loads are suspected.

Caution Sneedle Props are Heavy 40kg approx. (TWO PERSON LIFT) and may have sharp edges always wear protective clothing; gloves and protective foot wear.

Maximum load per Sneedle 400kg to be spaced at no more than 900mm centres, you should get advice from a structural engineer if you have any doubts. 

 